Power Plant
• Anti-corrosion resistance and high temperature stability
• The demonstration test has been completed in Yeongdong Thermal Power Plant, and the capabilities of coating have been verified.

Demonstration & Testing

Yeongdong Thermal Power Plant
-
Establishment of testbed for demonstration (Addition of testing capability to commercial facilities)
-
Establishment of demonstration infrastructure as a thermal power plant testbed
-
Construction of thermal power plant certification and verification system and procedure
-
Clean energy power plant demonstration and creation of legal infrastructure
-
Total R&D Cost : 1.77 billion KRW (Cash 1.37B KRW, Investment in kind 0.4B KRW)
-
Duration : 2016.11 ~ 2019. 09 (35 months)
-
Managing Institution : Korea Electric Power Research Institute (Manager : Bumsu Kim)
-
Participating Institutions : Korea South-East Power, Korea Institute of Industrial Technology, Korea Institute of Machinery & Materials, Chung-ang University, Mokpo National Maritime University, Gangwon Research Institute
![]() | ![]() | ![]() |
---|
-
Facilities for pressurizing water delivered from desulfurizing equipment and supplying it to boilers
-
Testing is being conducted on internal materials, including a C impeller, among boiler water supply pump A/B/C.
Expected Effects
-
Increase in lifetime due to improved wear-resistance and anti-corrosion properties
-
Coating can be applied to other facilities based on the demonstration data